|
GENERAL A Prefeasibility study for the proposed hydro-power scheme at Epupa was carried out for SWAWEK (now NAMPOWER ) in 1993 by Norconsult (Norway), Swedpower (Sweden) and Burmeister & Partners (Namibia) |
||
|
OPTIONS
FOR DOWNLOADING THE PREFEASIBILITY REPORT.
You are given multiple choices on how to download the prefeasibility study.
You can either download the whole report, or the different chapters. The
files below are in a WORD 6.0 format. |
||
| PREFEASIBILITY STUDY: | ||
|
REPORT SUMMARY |
9k |
|
|
INTRODUCTION |
5k |
|
|
POWER SYSTEM DESCRIPTION |
15k |
|
|
DEMAND FORECASTS |
27k |
|
|
DESCRIPTION OF CUNENE RIVER BASIN |
23k |
|
|
HYDROLOGY |
27k |
|
|
GEOLOGY AND MATERIALS |
15k |
|
|
HYDROPOWER DEVELOPMENT |
22k |
|
|
DESCRIPTION OF PROPOSED SCHEME |
10k |
|
|
ENVIRONMENTAL IMPACT ASSESSMENT |
52k |
|
|
ALTERNATIVE POWER SUPPLY |
5k |
|
|
ECONOMIC AND FINANCIAL EVALUATION |
14k |
|
|
BILATERAL CONSIDERATION |
10k |
|
|
RECOMMENDATIONS |
11k |
|