THICKENER
& LEACH TANK WASH DOWN SYSTEM
| Client: | Rossing Uranium Ltd | ![]() |
| Location: | Rossing Uranium Mine, Namibia | |
| Completed: | Ongoing | |
| Value: | N$ 400 000.00 | |
SERVICES PROVIDED
|
||
SHORT DESCRIPTION OF PROJECT Project comprises of design and installation of wash down pipeline with wash down points next to and on top of the Leach Tanks. The new wash down points must to have discharge pressure of minimum 5 bar to be able to remove the slimes and sand. It also include Wadiso steady state analysis of existing thickener wash down line for the purpose of reconnecting to existing pump system as pressure at discharge points are claimed to be below 5 bar requirement. |
||