KREEPY STANDBY LINE

Client: Rossing Uranium Ltd
Location: Rossing Uranium Mine, Namibia
Completed: Ongoing
Value: N$ 1 million

SHORT DESCRIPTION OF PROJECT

The Project comprises of the design and installation of a slurry line to operate during times when the existing line is being maintained. The pump set recycles plant spillages to a cyclone where this solution is separated. The pump line from pumps to the cyclone is approximately 130m long with eight long radius bends. The slurry pumped is of an abrasive and corrosive nature. Main aim of project is to increase plant availability.

SERVICES PROVIDED

  • Feasibility Study of Snake Pit maintenance improvements
  • Surveying of existing slurry line
  • Concept & Detail Design (and cost estimate)
  • Management of Change Documentation